|
Tender description :
|
Tenders are invited for Construction logistics - mbg, new building Martin Behaim Gymnasium General Description 1 Construction Logistics: 1.1 General Preliminary Services: Coordination for the start of logistics, project-related planning, software for logistics control, implementation of fire protection concept on the construction site, 1.2 Logistics Planning: Creation of storage area plan, updating logistics planning of the client, creation of delivery planning and area management, updating delivery planning and area management, 1.3 Personnel: Operational logistician, daily rate operational logistician (logistics coordinator), logistics assistant (ZuKo) - regular working hours, logistics assistant (ZuKo) - extended working hours, site paramedic position, Mon-Fri, daily rate fire protection assistant of the temporary fire protection concept, operational logistician - Saturday, logistics assistant (ZuKo) - Saturday, reporting and site documentation, 1.4 Construction Logistics Container: Transport and assembly of construction logistics container, -//- maintenance, -//- disassembly and transport, 1.5 Traffic / Area / Material / Transport Logistics: Signage of the construction site, traffic signs for transport in and out, -//- maintenance, -//- implementation, self-luminous warning bars for transport in and out, -//- maintenance, -//- implementation, padlocks for industrial vacuum cleaners with tipping chassis wet & dry, construction dryers, fire department access and marking of parking spaces, -//- maintenance SCHOOL 2 Construction Site Setup: 2.1 Demolition Scaffold / Scaffold Lift: Rack and pinion construction lift, extended use transfer -//-, demolition tower at the escape balcony, extended use transfer -//-, transitions from demolition tower to building, extended use transfer -//-, conversion transitions CANTEEN Demolition platform LK 4, use transfer -//- GYM Demolition platform LK 4 Level 1, use transfer -//-, Demolition platform LK 4 Level 2, use transfer -//- 3 Construction Site Cleaning: 3.1 Street Cleaning: Weekly street cleaning, additional street cleaning, manual street cleaning, disposal of sweepings, 3.2 Building Cleaning: Cleaning 4 Security: 4.1 Access Control: Gatekeeper access control - one access, extension of construction hours, barrier system delivery, installation and clearance, -//- maintenance, -//- implementation, construction site ID chip card (guests and visitors), construction site ID chip card, gatekeeper access control Saturday, 4.2 Locking Service: Opening and closing service Mon-Fri, -//- Saturday 5 Disposal: 5.1 Personnel: Disposal coordinator regular working hours, -//- extended working hours, 5.2 Recycling Center: Substructure for container standing area, setting up a recycling center, maintaining and operating recycling center regular working hours, -//- reduced 3WT, -//- reduced 1WT, relocating the recycling center, clearing the recycling center, 5.3 Transport and Disposal: Containers 5 cbm, -//- 7 cbm, -//- 10 cbm, -//- 15 cbm, -//- 30 cbm, bags for polystyrene plastics 2.5 m³, bags for mineral wool 2.5 m³, construction debris, mineral, recyclable, construction debris based on gypsum, recyclable, construction debris mineral / based on gypsum, not recyclable, paper / cardboard, steel scrap and iron metal scrap, aluminum, untreated wood, treated wood, mixed, composite packaging, mixed plastics, plastics (packaging, films, sorted, insulation materials (polyurethane, polystyrene), insulation materials (glass / mineral wool, foam glass), adhesives, sealants, paints, coatings, fiber composite materials, glass, flat industrial glass, construction site mixed waste, mixed municipal waste Estimated value excluding VAT:
|