|
Tender description :
|
Tenders are invited for {
"detected_language": "Hungarian",
"translated_text": "Euh2stars torch installation and slope reconstruction for Magyar Földgáztároló Zrt. related to the EUH2STARS project – Installation of a new flare in Pusztaszolos and procurement of slope system reconstruction. Due to character limitations, continuation to BT-24 (II.4.2.) point: The preferred parts of the flare: - Flare support pipe: height ~15 meters, where the flare burner will be placed, - Ladder, platforms: ensures access to the flare burner during shutdown in standard quantities, equipped with protective railing, - Flare burner: the goal is smoke-free operation, therefore, during the design of the flare burner, it must be ensured that it can provide an adequate amount of air for the incoming gases, thus achieving perfect, smoke-free combustion, - Local control panel + HEI Control panel: responsible for igniting the vented gases. The panel will be installed along the pipe route, approximately 22 meters from the flare (approximately 28 m along the pipe route), outside the safety zone but still within the area enclosed by the new fence. The unit includes the electrical and control engineering instruments of the traditional ignition flame, the sparking device, and the associated ignition structure and ignition control devices. The flare will start in case of emergency venting (EBD) or operator command. Primarily, an electric sparking device will take care of igniting the flare. Since the flare unit may not operate for months, the mentioned traditional ignition flame will also be installed. Slope system modification: The slope tank must be modified so that the collected medium can be automatically discharged into the DN50 PN16 groundwater main pipeline. Considering that the maximum pressure in the main pipeline can reach 20 barg, the automatic discharge of the designated slope tank must be realized with a self-priming pump, an intermediate steel cube tank, and a higher pressure centrifugal pump. Therefore, a new pneumatic diaphragm pump will be placed in the area next to the drip catcher, in a concrete containment. The pump will automatically start discharging the tank at maximum signal and stop at minimum signal. A pulsation vessel will be installed in the pump discharge line, followed by a switching filter pair, which is intended to remove the sand content of the slope liquid. The pipeline section after the switching filters connects to the inlet stub of the new steel cube tank. The design of the steel cube tank: double-walled, equipped with a leak detector. A level transmitter, a minimum and maximum level switch, and a breathing device will be installed on the tank. A new electric heating cartridge will ensure the temperature maintenance of the medium in the tank. A newly installed pump will transfer the medium from the steel cube tank to the new branch point of the DN50 size groundwater main pipeline. The system must be designed so that at maximum level signal, the pump automatically starts discharging the tank, while at minimum level, it automatically stops. The above-ground sections of the slope pipes must be designed with electric trace heating and thermal insulation. When designing the new venting and slope system, care must be taken to visually represent the system elements and integrate control functions into the new DCS. Thus, when configuring the DCS system during the design of field instrumentation and instrument loops, considerations for the future control engineering system to be implemented in Pusztaszolos must be taken into account. The technical implementation of this project is included in the Petrolterv 1424089 plan number titled \"Automation of the Pusztaszolos collection station,\" in volume VI titled \"Installation of a New Flare,\" with the following breakdown by discipline: - Technology - Technological machinery - Pipeline and structures - Cathodic protection - Load-bearing structures - Primary instrumentation - Electrical supply, grounding network - System design - Fire and explosion protection - Site preparation - Device design. Attachments: • D-design requirements • EBK requirements for contractors working in the MFGT area • Building permit • Unpriced budget • Detailed technical content, Plans Deadlines and Financial scheduling: 1st phase The arrival of short lead-time ordered items at the Contractor. (6th week from contract signing on the same day) (financial scheduling: 15%) 2nd phase The arrival of long lead-time ordered items at the Contractor, or - if necessary - at the Kardoskút site (14th week from contract signing on the same day) (financial scheduling: 25%) 3rd phase Architectural design of the flare garden and pipeline route, pipe installation works for the new flare line and pilot line between the Pusztaszolos technological area and the new flare (18th week from contract signing on the same day) (financial scheduling: 15%) 4th phase Comprehensive execution of architectural and mechanical tasks within the flare garden and the Pusztaszolos technological area (24th week from contract signing on the same day) (financial scheduling: 25%) 5th phase Comprehensive execution of electrical construction works, connection to the grounding network, and cathodic protection (26th week from contract signing on the same day) (financial scheduling: 5%) 6th phase Execution of instrumentation and control engineering tasks (28th week from contract signing on the same day) (financial scheduling: 5%) 7th phase Comprehensive execution of site preparation tasks and complete submission of final handover documentation (30th week from contract signing on the same day) (financial scheduling: 5%) 8th phase Final deadline (56th week from contract signing on the same day): Successful trial operation and transition to the new DCS system to be installed in Pusztaszolos during the trial operation period. (financial scheduling: 5%) The winning bidder must ensure the availability of all necessary tools and specialists in addition to the professionals specified
|