Tender description :
|
Tenders Are Invited for Comprehensive Renovation and Soil and Water Conservation Project at the Bridgehead of Luoyang Town
Overall Project Construction Content, Total Investment, and Total Construction Period: 1. Riverbank Remediation: Clearing and shoveling debris along the entire riverbank on both sides; constructing 1170m of new timber pile revetment , 172m of new ecological retaining wall , 32m of new gravity retaining wall , and 170m of new imitation timber pile revetment ; 9240m² of bank shoveling and debris clearing. 2. River Dredging: Hydraulic dredging; 1728.1m³ of dredged soil. 3. Water System Connection: Demolition of 5 obstructing dam foundations along the river; construction of 2 new vehicular bridges, 3 new pedestrian bridges, 2 new box culverts, 180m of new ecological drainage ditch, 110m of new rainwater pipe and supporting rainwater wells, 1 new channel control gate, 1 new drainage gate, and 3 new road culverts. 4. Soil and water conservation improvement design: Greening will be carried out on both banks of the river to improve the river environment, mainly through greening the slopes and tops of the embankments, combined with the planting of aquatic plants, covering an area of ??4,539 m2. Five new wharves will be built, and one new improvement node will be constructed.
Total investment: RMB 5.293 million; Total construction period: 150 calendar days; Completion date: May 18, 2027 .
Scope of this tender: 1. Riverbank Slope Remediation: Clearing debris and leveling the riverbanks along both sides of the river, constructing 1170m of new timber pile revetment , 172m of new ecological retaining wall , 32m of new gravity retaining wall , and 170m of new imitation timber pile revetment , totaling 9240m² of bank slope clearing and maintenance. 2. River Dredging: Using hydraulic dredging, removing 1728.1m³ of silt. 3. Water System Connection: Demolishing 5 obstructing dam foundations along the river, constructing 2 new vehicular bridges, 3 new pedestrian bridges, 2 new box culverts, 180m of new ecological drainage ditches, 110m of new rainwater pipes and supporting rainwater wells, 1 new channel control gate, 1 new drainage gate, and 3 new road culverts. 4. Soil and Water Conservation Improvement Design: Planting greenery on both banks of the river to improve the river environment, mainly focusing on greening the slopes and top of the embankment, combined with planting aquatic plants, totaling 4539m² of greenery. Five new wharves and one new upgrade node were built.
2.3.2 Estimated price of the contract: RMB 4.16 million .
The deadline for submission of bid documents (hereinafter referred to as the bid deadline) is 9:00 AM on December 10, 2026
|