|
Tender description :
|
Request for Qualifications: Wa’wáanma - Bear Creek Restoration Project Phase 2
GRANDE RONDE MODEL WATERSHED AND OREGON DEPARTMENT OF FISH AND WILDLIFEWA'WÁANMA - BEAR CREEK RESTORATION PROJECT PHASE 2 Proposals due 03/01/2027, 4:00 pm PST* REQUEST FOR COMPETITIVE SEALED PROPOSAL, BID, QUALIFICATIONSMandatory Pre-bid Conference at project site: December 1, 2026, 1:00 pm PST Located 6 miles up N. Bear Creek Road outside of the town of Wallowa, OR (https://maps.app.goo.gl/C3qwBjsNRo8tZeT9A)Dear Prospective Contractor: The Grande Ronde Model Watershed (GRMW), in conjunction with the Oregon Department of Fish and Wildlife (ODFW), seeks the services of a construction company with experience in river restoration to construct Phase 2 of the Wa'wáanma - Bear Creek Restoration Project in Northeast Oregon. The GRMW will be the contract holder for the entirety of this project. The Request for Proposal (RFP) will describe the services to be provided that include harvest and staging of trees, and the construction of large wood structures. Excavation of material to construct side channels and fill for main stem. The current county bridge will need to be replaced and relocated with a new bridge provided by ODFW and GRMW. Project habitat restoration elements will be constructed in accordance with the Final Design and Implementation Plan. The Final design includes all necessary construction protocols, design plan sets, and technical specifications. The GRMW, ODFW, and selected contractor will use these documents to implement the restoration project. The current 80% design documents are available at: https://drive.google.com/file/d/1YT_AlW8D8YjfhVkWXXMykjeDNiZ3aiyr/view The final design, technical specifications, and official RFP will be available dependent on the progress of the bridge being manufactured, current estimation is March of 2027. The RFP will be sent to each contractor that attends this pre-bid conference. The purpose of this tour is to allow contractors to view the site and project before snow accumulation makes it nearly impossible. The hired construction firm shall construct stream restoration elements that address the limiting factors for all life stages of Chinook salmon, steelhead, bull trout, and other native species within the project reach. The Habitat Improvement Program (HIPIV), programmatic biological opinion will be the conservation measures used for project implementation. The contractor hired shall work closely with the ODFW's technical representatives to complete the Project. Frequent and open communication, including onsite progress meetings are required. Services furnished by the construction company shall be provided as outlined in the RFP. Questions concerning the administration of the contract should be directed to Jesse Steele (GRMW) at (541) 663-0570. Questions concerning the implementation of the project should be directed to Nicholas Smith (ODFW) at (541) 805-5820. Your interest in this project is appreciated, and we look forward to receiving a proposal from your company.Published Nov. 16 & 18, 2026.4212863
|