|
Tender description :
|
Tenders are invited for Fire alarm system in the bag storage warehouse | Kujawy Cement Plant The subject of the proceedings is the comprehensive design, supply of equipment, as well as the installation and commissioning of the fire alarm system (SSP). The investment includes complete cabling, power supply, integration of notification devices, and training of technical staff at the plant in Bielawy. 1. Subject of the Order The detailed scope of work includes: Project documentation: Development of the SSP system project, taking into account the specifics of the warehouse and applicable standards, along with its approval by a fire protection expert. Power supply of the system: Execution of electrical power supply (route length up to 100 m) and provision of the required backup power supply. Supply and installation of SSP devices: Addressable fire alarm control panel (reference POLON 4200). Linear smoke detectors (reference DOP6001 along with mirror assemblies). Optical-acoustic signalers. Manual fire alarm call points (ROP) located at the entrance. SMS notification system with a 12-month subscription and GSM transmitter (reference TSG-1M). Cable installations: Execution of communication cabling in conduits (reference RL18) and execution circuits with wires of required fire resistance (reference HDGs), using certified mounting systems of appropriate function retention class. Commissioning and acceptance: Conducting electrical measurements, programming the control panel according to the established scenario, functional tests, handing over as-built documentation and instructions, and training designated employees of the Ordering Party. (The indicated types of devices are for reference only. The Ordering Party allows the use of equivalent or more advantageous solutions provided that the required parameters are met). 2. Conditions for Order Execution Execution deadline: By 15.12.2026. Place of execution: Holcim Kujawy Cement Plant in Bielawy. 3. Requirements for Bidders The bidder is obliged to select the number and placement of devices ensuring effective fire detection throughout the area. All offered devices must be mutually compatible and have documents confirming their applicability in fire protection systems. In the case of offering equivalent solutions, the manufacturer, type of device, and confirmation of technical parameters must be indicated. The bidder should specify any exclusions from the offer scope and requirements regarding the preparation of infrastructure on the Ordering Partys side. A site visit is recommended before submitting the offer. 4. Content and Method of Preparing the Offer The offer should include a complete, ready-to-use system, along with all necessary materials, devices, installation work, programming, and commissioning. The calculation should clearly include the net price and any additional costs. 5. Contact Persons For substantive/technical questions: Grzegorz Kasprzyk, tel.: 519 537 018, e-mail: grzegorz.kasprzyk@holcim.com Rafal Bugalski, tel.: 572 700 257, e-mail: rafal.bugalski@holcim.com Dariusz Marzec, tel.: 502 786 068, e-mail: dariusz.marzec@holcim.com For commercial/procedural questions: Beata Sherief, tel.: 572 700 442, e-mail: beata.sherief@holcim.com 6. Detailed conditions of cooperation The required payment term for invoices is 60 days. An integral part of the request for proposals are the General Terms of Delivery and Services dated 01.04.2024, which constitute an annex to the inquiry. Holcim Polska S.A. reserves the right to cancel, withdraw, repeat, postpone, or terminate the process of reviewing offers without giving reasons. As a result, bidders have no claims against Holcim. Holcim Polska S.A. reserves the right to contact only selected bidders. The parties exclude the application of Article 68² of the Civil Code. An offer that does not meet all the above conditions may eliminate the bidder from the selection process. In the case of providing services on the premises of the plant, the contractor is obliged to comply with the provisions contained in the Code of Ethics for Suppliers, which is an annex to the inquiry. 7. List of Attachments Attachment No. 1 - General Terms of Delivery and Services Holcim Polska SA Attachment No. 2 - Health and Safety and Environmental Requirements Attachment No. 3 - Code of Ethics for Suppliers
|