Requirement :
|
Design and Construction of 21 mtr Span Minor Permanent Simply Supported T-beam Bridge Over Gnon samdoong-1 at Km 6.500, 12 Mtr Span Minor Permanent Simply Supported T-beam bridge Over Gnon Samdoong-2 at Km 6.95, 10 Mtr Span Minor Permanent Simply
supported T-beam Bridge Over Gnon Samdoong-3 at Km 7.30, and 12 Mtr Span minor Pmt Simply Supported T-beam Bridge Over Lingdong Khola at Km 21.180 duly Proof Checked of Design and Drawings on Dikchu-sanklang Road Under 107 Rcc/758 Brtf Project Swastik in the State of Sikkim (job No. 314/185, 314/186, 314/187, 314/188)
|