Requirement :
|
Annual Preventive Maintenance Contract of Test Equipments in Fuel Factory Non Su 30 and Design Building for Two Years, New Fcu Test Rig 3m, 2 New Drh Test Rig. 3m, 3 Dvg Test Rig. 3m, 4 Hawk Test Rig. 3m, 5, 6 Mgc-602 Rig Old 3m, 3m, 7 Hydraulic Preservation Test Rig, Burner Rig 8 Asg Rig 3m, 9 Parawash Rig 3m, 10 Old Fcu Rig 3m, 11 Nprc Rig 3m, 12 Multipurpose Rig 3m, 13 Drh (old) Rig 3m, 14 3m, 15 Np34 Rig (main Hydraulic Pump, Test Rig), Np27 Rig. 16 Sts Rig. 3m, 17 Dnj Rig. 3m, 18 495b Rig. 3m, 19 Inhibit Rig No.1. 3m, 20 Inhibit Rig No.2. 3m, 21 Np34 Leak Test Rig 3m, 22 Leak Test Rig No.1 3m, 23 Spr20 Test Rig 3m, 24 Characteristic Rig 3m, 25 Rig for Flushing Parts 3m, 26 Jet Washing Rig 3m, 27 Russian Flushing Rig 3m, 28 Fadec Reheat Control Unit 3m, 29 Fadec Maint Engine Control Unit 3m, 30 Fadec Multipurpose Rig 3m, 31 Hot Bath No.1 3m, 32 Hot Bath No.2 3m, 33 Tr-1 Test Rig 3m, 34 Tr-5 Test Rig 3m, 35 Hydraulic Rig Hydraulic Console 3m, 36 Hydraulic Proof Test Rig 3m, 37 Hydraulic Press 3m, 38 Endurance Test Rig.
|