Requirement :
|
Annual Maintenance Contract for Structural Work at Mining Plants. Repair, Maintenance, and Installation of Plant/ Systems/ Equipments (version 2) - Industry Unit; Dismantling of Structurals Tanks Machineries Equipments at All Levels and at Either of the Plants 25 Ton as Per Scope of Work; as Per Scope of Work , Repair, Maintenance, and Installation of Plant/ Systems/equipments (version 2) - Industry Unit; Structural Fabrication and Thereafter Painting of Structurals at Either of the Plants 50 Ton as Per Scope of Work; as Per Scope of Work , Repair, Maintenance, and Installation of Plant/ Systems/equipments (version 2) - Industry Unit; Erection of Structurals Equipments at All Levels and at Either of the Plants 50 Ton as Per Scope of Work; as Per Scope of Work , Repair, Maintenance, and Installation of Plant/ Systems/equipments (version 2) - Industry Unit; Pipe Line Fabrication Modification and Replacement with Oldnew Pipe Upto 380 Nb at Either of the Plants 200 Meter as Per Scope of Work; as Per Scope of Wo.. , Repair, Maintenance, and Installation of Plant/ Systems/equipments (version 2) - Industry Unit; Rubber Lining Works the Rubber Lining is to Be Done By Cold Vulcanization Work and Lined with New Rubber Sheet Old Conveyor Belt 50 Square Meter as Per S.. , Repair, Maintenance, and Installation of Plant/ Systems/equipments (version 2) - Industry Unit; Supplying Providing and Fixing of Gi Roof Sheet Work 250 Square Meter.
|