Tender Detail

Buyer/Seller : Can be viewed by Subscribers
TOI : 82110796
Requirement : Construction and upgrade of irrigation schemes
Tender description : General Procurement Notice : Construction and upgrade of irrigation schemes The project will include the following components: Component A. Improvement of Irrigation Infrastructure: The Panj scheme covers nearly 16,534 ha, is supported by 8 WUAs and managed by 1 Agency for Land Reclamation and Irrigation (ALRI) district office and regional office. The scope of this component includes: Construction and upgrade of irrigation schemes with a cumulative length of 228 km and serving an area of around 16,534 ha. This will include rehabilitation of irrigation headworks and primary and secondary canals including intake structures, headworks, control gates, main canals, collector and drainage networks, and pump stations to be repaired or modernized. Civil works will also include climate-resilient infrastructure to increase resilience to floods and debris flows. Works will include slope protection and riverbank stabilization adjacent to intake structures, canals, and pumping stations. Rehabilitation of the 33 ha sedimentation pool. Supply and Installation of energy efficient pumps in 18 irrigation pumping stations to improve water supply to 16,534 ha arable land. Pump station modernization will include replacing or rehabilitating pumps and electric motors and equipping workshops for routine maintenance of pumps and motors. Component B. Supply of O&M Machinery: this will entail supply of key O&M machinery (i.e. excavators, tractors, motorbikes etc.) for local irrigation water management authorities – ALRI branches. Component C. Detailed Engineering Design and Supervision Consultancy Services will include consulting services for development of detailed engineering design, preparation of tender documents, and supervision of civil work contracts and pumping stations replacement/installation under the Project. The Consultant company will ensure high standards of construction and compliance with the established water irrigation standards which shall be followed through Contract Management Plan (CMP). In addition, the consultant will also prepare an environmental and social management plan (ESMP) and ensure its implementation by the contractor. The consultant will also be responsible for broader M&E to report on irrigation scheme efficiency, risk indicators and sustainability aspects. Component E. Financial Audit: will finance consulting services to execute the financial audit of the project through an independent external auditor. The auditor will also undertake on sample basis, review of procurement packages.
Company Industry: Non Classified

Key values

Closing date : 18/03/2026
Location : Tajikistan - Not Classified

Tender Documents

Top