Requirement :
|
A.E. Work Between KM 0.83 to KM 0.9 KM, 1.13 to 1.42 and KM 1.66 to 1.74 of EAB (Agenda No EAB/HW/05/2026). Earthwork filling in country side of EAB in proper slope 41 in length of 70m, 290m and 80m between 0.83 km to 0.9 km, 1.13 km to 1.42 km and 1.66 km to 1.74 km respectively of EAB & making ramp to suitable site, also providing 1.80 m wide two-layer geo bag gabion toe of size 1.8nx 1.2mx0.5m in country side of embankment & single layer geo bag pitiching in slope up to 2 m height above toe over geo textile filter.
|