Tender description :
|
Tenders Are Invited for Ve2223.6 Security Technology Video Gma
Fraport AG has completed the construction of Terminal 3, including sections of Concourse G. Parts of Concourse G are already operational. This also applies to the main terminal building and Concourses H and J. A section of Concourse G currently exists only as a partially completed shell. This section is being, or will be, separated from the operational areas by temporary measures and is now slated for full completion. For the structural implementation, construction services are being tendered in the following trades, among others: Interior fit-out, Electrical, Building automation, Public address system (PA) including communications technology, Building automation, Security technology (video, alarm system), Mechanical, Baggage handling systems, Canopy, Extended shell construction. The subject of this tender is services for VE2223.6 Security technology (video, alarm system) with, among others, the following service areas: Alarm system/central control system: • New installation and interior fit-out of alarm system floor distribution boxes up to approx. HxWxD 2000x1200x500 including base and transmission equipment: approx. 3 units • New installation and interior fit-out of central control system floor distribution boxes up to approx. HxWxD 2000x800x800 including base: approx. 1 unit • New installation including connection of CAT7 S/FTP AWG22 data cables: approx. 1000 m • New installation including connection of telecommunications lines up to 20 twisted pairs for secondary technology, Including installation system: approx. 6000 m • New installation of door and gate controls (including key switches, door distributors, emergency exit terminals), including programming, complete connection readiness, and installation of door components: approx. 23 units • New installation of BPOL alarm detectors (panic alarms), including programming, complete connection readiness, and installation: approx. 7 units • New installation of ZKS readers, including programming, complete connection readiness, and installation: approx. 7 units • Light barrier curtain for GFA flap monitoring: approx. 6 units • Decommissioning and recommissioning of existing door controls: approx. 10 units • VIDEO: • Supply, installation, and commissioning of video cameras, including patch cables, wall/ceiling mounts, and programming: approx. 40 units • New installation of cable ducts and pipes up to DN 25: approx. 200 m • Commissioning of video surveillance systems, including interfaces to ZKS and AGVs: approx. 40 units • Coordination with the Contractor for telecommunications, fire alarm systems, and access control systems: Supply and operational installation of the new systems, including commissioning. Commissioning services and standby maintenance prior to legally binding acceptance. The site facilities and logistics for all construction activities, including those of the other participating trades, will be provided and managed by the contractor. The following services will be provided by the client: - overall coordination of trial operation - overall coordination of commissioning. Start of services: Q4 2026. Start of installation/execution: Q1 2027. Start of commissioning: Q3 2028. End of services (including any remaining work and acceptance): Q1 2029.
fraport Ag Has Realized the New Construction of Terminal 3, Including Parts of Concourse G. Parts of Concourse G Have Already Been Put Into Operation. This Also Applies to the Main Terminal Building and to Concourses H and J. a Part of Concourse G Has so Far Only Been Constructed as a Refined Shell. This Part of the Building is Or Will Be Separated From the Operational Areas By Interim Measures and is Now to Be Fully Completed.
for the Construction Realization, the Construction Services Are to Be Tendered in the Following Trades:
- Expansion
- Electrical
- Building Automation
- Ela Including Telecommunications
- Bos
- Bma
- Security Technology (video, Gma)
- Mechanics
- Baggage Handling Systems
- Canopy
- Extended Shell
the Subject of This Tender is Services for Ve2223.6 Security Technology (video, Gma) Including the Following Service Areas:
gma/zks:
• New Installation and Interior Construction of Ema Floor Distributors Up to Approx. Hxwxd 2000x1200x500 Including Base and Transmission Device: Approx. 3 Pcs.
• New Installation and Interior Construction of Zks Floor Distributors Up to Approx. Hxwxd 2000x800x800 Including Base: Approx. 1 Pc.
• New Installation Including Connection of Data Lines Cat7 S/ftp Awg22: Approx. 1000 M
• New Installation Including Connection of Telecommunications Lines Up to 20 Pairs for Secondary Technology, Including Laying System: Approx. 6000 M
• New Installation of Door Controls and Gate Controls (including Key Switch, Door Distributor Emergency Exit Terminal), Including Programming, Complete Readiness for Connection, and Installation of Door Components: Approx. 23 Pcs.
• New Installation of Bpol Alarm Detectors (robbery Detectors) Including Programming, Complete Readiness for Connection, and Installation: Approx. 7 Pcs.
• New Installation of Zks Readers, Including Programming, Complete Readiness for Connection, and Installation: Approx. 7 Pcs.
• Light Curtain for Flap Monitoring Gfa: Approx. 6 Pcs.
• Outside and Recommissioning of Existing Door Control: Approx. 10 Pcs.
video:
• Delivery, Installation, and Commissioning of Video Cameras Including Patch Cable, Wall/ceiling Mount, Programming: Approx. 40 Pcs.
• New Installation of Installation Channels and Pipes Up to Dn 25: Approx. 200 M
• Commissioning of Video Surveillance System Including Interfaces to Zks, Fts Approx. 40 Pcs.
• Coordination with the Trades of Telecommunications, Alarm System, and Access Control System.
delivery and Operationally Capable Installation of the New Systems, Including Commissioning.
commissioning Services and Downtime Maintenance Before Contractual Acceptance.
the Construction Site Setup Areas and Logistics for All Construction Measures, Including Those of Other Involved Trades, Will Be Provided and Managed By the Contractor Extended.
the Following Services Will Be Provided By the Client:
- Overall Coordination of Trial Operation
- Overall Coordination of Commissioning
start of Services: 4th Quarter 2026
start of Assembly/execution: 1st Quarter 2027
start of Commissioning: 3rd Quarter 2028
end of Services (including Subsequent Residual Services and Acceptance): 1st Quarter 2029
estimated Value:
|