Requirement :
|
Repair of existing 25T ductable air conditioner installed at 220 KV Bale substation 2.5T A.C. Expansion Valve, R-22 Freon Gas, A.C. Plant Air Compressor Belt (B Group), 5.5T Duct A.C. Catch Well Filter, 5.5T Duct A.C. O/D unit Fan Motor, 5.5T Duct A.C. Fan Blade, 5.5T Duct A.C. LP/HP Pressure Switch, 5.5T Duct A.C. Blower, 5.5T A.C. Blower Motor Bearing, 2T A.C. Fan Motor Condenser, ?" Cu Pipe - A.C., ¼" Cu Pipe - A.C., ?" Cu Pipe - A.C., Condensing Coil 250-300V AC, 5.5T 3Ø Compressor, Pedestal Bearing (P210), 415V 250A 3P Power Contactor (CK09BE311), HDIG Booster Op. Handle Assy for AHU, 1.1kV PVC FRLS 4Cx2.5mm² Cu Ar Ctl Cable, Electrical Panel for 11T AC Plant, Repairing of 15HP Booster Blower, Repairing of 15HP Booster Blower Motor, Installation of 8” Pulley of Booster, Servicing of Impeller of Booster, Shift&Fabri. of 15HP Booster of AC Plant, Canvas 10m Connection of 15HP Booster
|