Tender description :
|
Supply, Delivery, Commissioning and Installation of Additional 48 pieces Solar Panels at MWD Admin Building
SUPPLY, DELIVERY, COMMISSIONING AND INSTALLATION OF SOLAR PANELS ITEM DESCRIPTION: *Panels 48 pcs 12 yrs product warranty Cell Type: N -type Mono-crystalline No. of cells : 14472×2 mm Dimensions: 2278×1134×30 mm Weight: 25.0 to 30.0 kg Front Glass: 3.2 mm, Anti-Reflection Coating, High Transmission, Low Iron, Tempered Glass Frame: Anodized Aluminium Alloy Junction Box: IP68 Rated Protection Class Class C IEC Fire Type 0utput Cables: 4.0 mm² +: 400 mm , -: 200 mm or Customized Length Pallet Dimensions: 2308×1120×1249 mm Packing Detail : Two pallets = 0ne stack 36 pcs/pallets, 72 pcs/stack, 720 pcs/ 40HQ Container Maximum Power Voltage - Vmp [V] 42.99 43.17 43.35 43.53 43.71 Maximum Power Current - Imp [A] 13.26 13.32 13.38 13.44 13.50 Open-circuit Voltage - Voc [V] 51.99 52.15 52.31 52.47 52.63 Module Effciency STC [%] 22.07 22.26 22.45 22.65 22.84 Power Tolerance 0 ~ + 3 % Temperature Coefficients of Pmax: -0.29 %/°C Temperature Coefficients of Voc : -0.25 %/°C Temperature Coefficients of Isc : 0.045 %/°C Maximum Power - Pmax [Wp] 430 433 437 441 445 Maximum Power Voltage - Vmp [V] 40.37 40.54 40.70 40.86 41.05 Maximum Power Current - Imp [A] 10.64 10.69 10.74 10.79 10.83 Open-circuit Voltage - Voc [V] 49.38 49.54 49.69 49.84 49.99 Short-circuit Current - Isc [A] 11.21 11.26 11.31 11.36 11.41 0perating Temperature -40 °C ~ +85 °C Maximum System Voltage 1000/1500 VDC IEC Maximum Series Fuse Rating 25 A Nominal Operating Cell Temperature 45±2 °C Mounting System: Aluminum alloy tin roof mounting system Made with light-weight aluminum alloy 10 years warranty at 245 kph windspeed *Installation and Commissioning Includes engineering design, delivery, installation and commissioning. Includes panel cleaning, monitoring of systemperformance, checking of cables and trouble-shooting 2 years warranty on installation work a. System engineering and design b. Design modifications c. Supply and delivery of sytem components including Balance of System items d. Installation of Mounting System and Solar panels e. DC and AC wiring and electrical works f. Installation of inverter & monitoring devices g. Installation of required safety devices AC/DC breakers h. Establish internet connectivity i. Energization and testing ****************** Nothing Follows *************
Pre-bid Conference:
Approved Budget: 800,000.00
Closing Date: 02/03/2026
|