Requirement :
|
The project involves the construction of a piped water supply scheme, including the design and construction of RCC elevated service reservoirs with a capacity of 40 KL and 25 KL, along with a distribution network. The work includes excavation for pipe trenches in various soil types, installation of PVC and HDPE pipes, and the provision of a chlorinator system. Additional tasks include road cutting, electric connections, and the construction of boundary walls. RCC overhead tank, PVC pipes, HDPE pipes, chlorinator system, boundary wall
|
|
Tender description :
|
The project involves the construction of a piped water supply scheme, including the design and construction of RCC elevated service reservoirs with a capacity of 40 KL and 25 KL, along with a distribution network. The work includes excavation for pipe trenches in various soil types, installation of PVC and HDPE pipes, and the provision of a chlorinator system. Additional tasks include road cutting, electric connections, and the construction of boundary walls.
|