|
Tender description :
|
Tenders are invited for D1 turany mushroom, construction work
The subject of the contract is the construction of a highway section D1 Turany - Hubová with a total length of 13.53 km, including the Korbelka and Havran tunnels. The proposed section of the highway includes a total of ten permanent bridge structures, of which four are directly on the highway and two are ecoducts. In addition to the permanent bridges, one temporary bridge over the Váh River made of steel prefabricated structures is proposed, which is in the routes of temporary access during the construction of the highway. To eliminate land take, ensure the stability of the D1 highway body, and protect against the effects of large waters, retaining and supporting walls are proposed. Within the D1 construction, three supporting and two retaining walls are proposed. The construction area is crossed by several overhead and underground engineering networks - water supply, gas pipelines, high-voltage lines, and low-voltage, medium-voltage, and local telecommunications lines and networks. All affected lines will be relocated or protected to the extent caused by the construction in accordance with the requirements of individual managers. In the terminal section of the D1 highway Turany - Hubová, a maintenance and management center in Švošov is proposed at a reachable distance from the Hubová junction, accessible by a new bridge over the Váh River. The subject of the contract is detailed in volumes 1 to 5 of the competition documentation.
Estimated value excluding VAT: 1 573 099 322,00EUR
|