Requirement :
|
The work involves the disposal of 375 tons of stored soil, the creation of a 2,200 m2 plane, the loosening and temporary storage of 1,275 m3 of soil, the reinstallation of 550 m3 of stored soil, the production of 900 m3 of FSS, the removal of 1,050 m2 of asphalt pavement, the construction of 1,850 m2 of asphalt base and surface layers, the installation of 60 m of curbstone and a 3-row gutter, and the construction of a 95 m amphibious guide device. Additionally, the existing steel pipe must be extended on both sides according to the road widening. stored soil, FSS, asphalt pavement, asphalt base layer, asphalt surface layer, curbstone, 3-row gutter, amphibious guide device, steel pipe
|