|
Tender description :
|
Improvement of Multi-Purpose Building for Child Development Center at Sitio Sulukan, Brgy. Anastacia, Tiaong, Quezon 2nd Post
605 Project Billboard/Signboard Quantity: 5.76 sq.m Materials: Ord. Plywood 1/2 x 4 x 8 2.00 pcs Coco Lumber 2 x 3 x 8 5.00 pcs Tarpaulin 8 x 8 1.00 unit Assorted CWN 1.00 kls Labor: 1 Carpenter 0.50 day 1 Laborer 0.50 day SPL-1 Occupational Safety & Health Program Quantity: 1.00 lot Materials: Safety Helmet 8.00 pcs Hand Gloves 8.00 pair Safety Shoes 8.00 pair Miscellaneous Items 1.00 lot Medicine, Medicine Cabinet, Water, First-Aid Kit 103 Structure Excavation Quantity: 5.70 cu.m Labor: 1 Skilled Worker 1.00 day 3 Laborer 1.00 day Equipments: Minor Tools 10% of Labor Cost 8041a Embankment from Strucure Excavation Quantity: 5.00 cu.m Labor: 1 Construction Foreman 1.00 day 1 Laborer 1.00 day Equipments: Minor Tools 10% of Labor Cost SPL-2 Demolition and Gate Repair Quantity: 1.00 lot Materials: Welding Rod 5.00 kgs Cutting Disc 1.00 box Labor: 2 Skilled Worker 1.00 day 2 Laborer 1.00 day Equipments: 1 Welding Machine 4.00 hours Minor Tools 10% of Labor Cost SPL-3 Reinforced Concrete and Masonry Works Quantity: 1.00 lot Materials: Cement 43.00 pcs Sand 4.00 cu.m Gravel 2.00 cu.m CHB 4 355.00 pcs RSB 10mm 47.00 pcs Tie Wire 3.00 kgs Acrylic Lettering 1.00 lot Consumables 5% of Materials 1.00 lot Labor: 1 Construction Foreman 5.00 day 3 Skilled Worker 5.00 day 3 Laborer 5.00 day Equipments: Minor Tools 10% of Labor Cost SPL-4 Roofing Works Quantity: 110.25 lot Materials: Long Span Rib Type Colored Roof, Ga. 26 116.00 sq.m. Angle Bar 2x2x4.5mm 43.00 pcs C-Purlins 2x4x20 49.00 pcs C-Purlins 2x6x20 8.00 pcs Channel Bar 2x4x20 1.00 pcs Pre-painted Gutter, Ga. 24 0.701 mm X 2.44 m 10.00 pcs Pre-painted Ridge Roll, x 0.6mm x 2.45 m 5.00 pcs 12 x 1 Plain GI Strap 63.00 pcs Welding Rod 10.00 kgs Texscrew 1,200.00 pcs Cutting Disc 2.00 box PVC Pipe 3 8.00 pcs PVC Elbow 3 8.00 pcs Consumables 1.00 lot Labor:including the dismantling of existing roof 1 Construction Foreman 11.00 day 4 Skilled Worker 11.00 day 4 Laborer 11.00 day Equipments: Welding Machine 16.00 hours Minor Tools 10% of Labor Cost 1003 Ceiling Works Quantity: 107.75 sq.m Materials: Hardieflex 4 x 8 45.00 pcs Wall Angle 0.6mm x 3m 51.00 pcs Carrying Channel 0.8mm x 5m 54.00 pcs Double Furring Channel 0.5mm x 5m 58.00 pcs Double Furring Clip 315.00 pcs Black Tekscew 5.00 box Perforated Paper Tape 76m/roll 1.00 roll Assorted CWN 1.00 kgs Latex Paint 9.00 gal Paint Brush 2 2.00 pcs Paint Roller 7 with tray 2.00 pcs Blind Rivets 8.00 box Hardieflex Scoring Knife 2.00 pcs Consumables 5% of Materials 1.00 lot Labor: 1 Construction Foreman 5.00 day 3 Skilled Worker 5.00 day 3 Laborer 5.00 day 1032 Paint Works Quantity: 226.70 sq.m Materials: Primer Flat Latex 20.00 gal Top Coat Latex 22.00 gal Gray Metal Primer 4.00 gal Enamel Paint 4.00 gal Paint Brush 4 4.00 pcs Paint Brush 2 4.00 pcs Paint Roller 7 with tray 4.00 pcs Sand Paper 100 10.00 meter Mesh Tape 5.00 pcs Consumables 5% of Materials 1.00 lot Labor: 2 Skilled Worker 7.00 day 2 Laborer 7.00 day 1018 Tile Works Quantity: 56.81 sq.m Materials: 60cm x 60 cm Tiles Non-skid 92.00 pcs 30cm x 30 cm TilesNon-skid 188.00 pcs Tile Adhesive 12.00 bags Tile Grout 13.00 bags Consumables 2% of Materials 1.00 lot Labor: 1 Construction Foreman 6.00 day 2 Skilled Worker 6.00 day 2 Laborer 6.00 day Equipments: Minor Tools 10% of Labor Cost SPL-5 Doors & Windows Quantity: 1.00 l.s Materials: Analok Glass Window with Frame and acc. 1.2x1.6 0.32 sq.m Flush Hollow Core Door with Door Jamb 5.67 sq.m PVC Swing Door with Door Jamb 2.94 sq.m Door Locks Schlage or Equivalent 5.00 set Door Hinge 50mm x 101mm 20.00 pc Consumables 1.00 lot Labor: 2 Skilled Worker 2.00 day 2 Laborer 2.00 day 10024 Plumbing Fixtures Quantity 1.00 l.s. Materials Water Closet inc. fittings & acc. round american std or equivalent 2.00 pcs Floor Drain 3.00 pcs Stainless Sink-Double 1.00 pcs Deck Mounted Faucet 5.00 pcs Bidet Set 2.00 pcs Stainless Wall Faucet 2.00 pcs Consumables 5% of Material Cost 1.00 lot Labor 2 Skilled Laborer 1.00 days 2 Laborer 1.00 days Equipment Minor Tools 10% of Labor Cost 1.00 lot SPL-6 Water & Sewer Line Works Including Septic Tank Quantity 1.00 l.s. Materials Cement 32.00 pcs Sand 2.00 cu.m Gravel 3/4 2.00 cu.m RSB 12mm 10.00 pcs RSB 10mm 24.00 pcs CHB 6 150.00 pcs CHB 4 25.00 pcs Liquid Asphalt 2.00 gal PVC Pipe, 100mm Ø x 3m, S-100 5.00 pcs PVC Pipe, 50mm Ø x 3m, S-100 8.00 pcs 50mm Ø PVC Pipe Coupling 4.00 pcs PVC Elbow 90 deg. 100mm Ø 3.00 pcs PVC Wye 100mm Ø 1.00 pcs PVC Wye 50mm Ø 1.00 pcs PVC Elbow 90 deg. 50mm Ø 4.00 pcs PVC Elbow 45 deg. 50mm Ø 2.00 pcs PVC Tee 100mm Ø 5.00 pcs PVC Tee 50mm Ø 4.00 pcs PVC Sanitary Clean Out 100mm Ø 1.00 pcs PVC Sanitary Clean Out 50mm Ø 1.00 pcs PVC Solvent Cement 1.00 cans PPR Coupling 3/4 3.00 pcs PPR Coupling 1 4.00 pcs PPR Tee, 3/4 6.00 pcs PPR Tee, 1 4.00 pcs PPR Elbow 3/4 Plain 10.00 pcs PPR Elbow 1 Plain 6.00 pcs PPR Reducer 1 x 3/4 4.00 pcs PPR Pipe 1 3.00 pcs PPR Pipe 3/4 5.00 pcs Gate Valve 1.00 pcs Teflon Tape 10m 3.00 pcs Consumables 5% of Materials 1.00 lot Labor 1 Foreman 5.00 days 2 Skilled Laborer 5.00 days 2 Laborer 5.00 days Equipment Minor Tools 10% of Labor Cost SPL-7 Electrical Works Quantity: 1.00 l.s Materials: 3.5mm2 THHN/THWN Wire 75.00 mtrs 2.0mm2 THHN/THWN Wire 90.00 mtrs T8 18w Louver Type Double Tube Fluorescent Daylight 2.00 pcs 14w LED Bulb Daylight with receptacle 5.00 pcs 2 Gang Switch 1.00 pcs 1 Gang Switch 4.00 pcs 2 Gang Universal Type Outlet 3.00 pcs Junction Box 7.00 pcs Flexible Hose 30.00 mtrs Plastic Molding 1/2 10.00 pcs AMCO Box 10.00 pcs Panel board 6 branches 1.00 unit 60Amp Breaker 1.00 pc 20 Amp breaker 2.00 pcs 15 Amp Breaker 1.00 pcs Consumables 5% of Material Cost 1.00 lot Labor: 1 Construction Foreman 2.00 day 2 Skilled Worker 2.00 day 1 Laborer 2.00 day
Pre-bid Conference:
Approved Budget: 996,816.54
Closing Date: 28/05/2026
|