Tender Detail

Buyer/Seller : Can be viewed by Subscribers |
TOI : 96530547
Requirement : Improvement of Brgy. Health Center at Brgy. Bukal, Tiaong, Quezon
Tender description : Improvement of Brgy. Health Center at Brgy. Bukal, Tiaong, Quezon B.5 Project Billboard/Signboard Quantity: 5.76 sq.m Materials: Ord. Plywood 1/2 x 4 x 8 2.00 pcs Coco Lumber 2 x 3 x 8 5.00 pcs Tarpaulin 8 x 8 1.00 unit Assorted CWN 1.00 kls Labor: 1 Carpenter 0.50 day 1 Laborer 0.50 day B.7 Occupational Safety & Health Program Quantity: 1.00 lot Materials: Safety Helmet 10.00 pcs Hand Gloves 10.00 pair Safety Shoes 10.00 pair Miscellaneous Items 1.00 lot Medicine, Medicine Cabinet, Water, First-Aid Kit SPL-1 Demolition Quantity: 1.00 lot Labor: 3 Skilled Worker 3.00 day 3 Laborer 3.00 day Equipments: Minor Tools 10% of Labor Cost SPL-2 Reinforced Concrete and Masonry Works Quantity: 1.00 lot Materials: Cement 107.00 pcs Sand 11.00 cu.m CHB 4 1,240.00 pcs RSB 10mm 78.00 pcs Tie Wire 10.00 kgs Acrylic Lettering 1.00 lot Consumables 5% of Materials 1.00 lot Labor: 1 Construction Foreman 11.00 day 2 Skilled Worker 11.00 day 2 Laborer 11.00 day Equipments: Minor Tools 10% of Labor Cost SPL-3 Roofing Works Quantity: 87.50 sq.m Materials: Long Span Rib Type Colored Roof, Ga. 26 91.90 sq.m. Angle Bar 2x2x4.5mm 101.00 pcs C-Purlins 2x4x20 33.00 pcs C-Purlins 2x6x20 4.00 pcs Pre-painted Gutter, Ga. 24 0.701 mm X 2.44 m 6.00 pcs Pre-painted Ridge Roll, x 0.6mm x 2.45 m 6.00 pcs 12 x 1 Plain GI Strap 37.50 pcs Welding Rod 10.00 kgs Texscrew 950.00 pcs Cutting Disc 2.00 box PVC Pipe 3 6.00 pcs PVC Elbow 3 8.00 pcs Consumables 2% of Materials 1.00 lot Labor:including the dismantling of existing roof 1 Construction Foreman 12.00 day 4 Skilled Worker 12.00 day 4 Laborer 12.00 day Equipments: 1 Welding Machine 32.00 hours Minor Tools 10% of Labor Cost 1003 Ceiling Works Quantity: 82.75 sq.m Materials: Hardieflex 4 x 8 34.00 pcs Wall Angle 0.6mm x 3m 47.00 pcs Carrying Channel 0.8mm x 5m 51.00 pcs Double Furring Channel 0.5mm x 5m 52.00 pcs Double Furring Clip 280.00 pcs Black Tekscew 3.00 box Perforated Paper Tape 76m/roll 1.00 roll Assorted CWN 1.00 kgs Latex Paint 7.00 gal Paint Brush 2 3.00 pcs Paint Roller 7 with tray 3.00 pcs Blind Rivets 6.00 box Hardieflex Scoring Knife 2.00 pcs Consumables 5% of Materials 1.00 lot Labor: 1 Construction Foreman 6.00 day 2 Skilled Worker 6.00 day 2 Laborer 6.00 day 1032 Paint Works Quantity: 510.95 sq.m Materials: Primer Flat Latex 20.00 gal Top Coat Latex 38.00 gal Gray Metal Primer 9.00 gal Paint Brush 4 6.00 pcs Paint Brush 2 6.00 pcs Paint Roller 7 with tray 4.00 pcs Sand Paper 100 15.00 meter Mesh Tape 5.00 pcs Consumables 5% of Materials 1.00 lot Labor: 3 Skilled Worker 6.00 day 3 Laborer 6.00 day 1018 Tile Works Quantity: 75.65 sq.m Materials: 60cm x 60 cm Tiles Non-skid 195.00 pcs 30cm x 30 cm TilesNon-skid 219.00 pcs Tile Adhesive 26.00 bags Tile Grout 23.00 bags Consumables 2% of Materials 1.00 lot Labor: 1 Construction Foreman 8.00 day 3 Skilled Worker 8.00 day 3 Laborer 8.00 day Equipments: Minor Tools 10% of Labor Cost SPL-4 Doors & Windows Quantity: 1.00 l.s Materials: Flush Hollow Core Door with Door Jamb 5.67 sq.m Analok Glass Window with Frame and acc. 2.52 sq.m PVC Swing Door with Door Jamb 13.23 sq.m Door Locks Schlage or Equivalent 12.00 set Door Hinge 50mm x 101mm 44.00 pc Consumables 2% of Material Cost 1.00 lot Labor: 2 Skilled Worker 3.00 day 2 Laborer 3.00 day 10024 Plumbing Fixtures Quantity 1.00 l.s. Materials Water Closet inc. fittings & acc. round american std or equivalent 5.00 pcs Stainless Steel Kitchen Sink Single 4.00 pcs Floor Drain 9.00 pcs Shower Head with Valve Set 4.00 pcs Deck Mounted Faucet 4.00 pcs Bidet Set 5.00 pcs Stainless Wall Faucet 6.00 pcs Consumables 3% of Material Cost 1.00 lot Labor 1 Foreman 3.00 days 2 Skilled Laborer 3.00 days 2 Laborer 3.00 days Equipment 1 Minor Tools 10% of Labor Cost 1.00 lot SPL-5 Water & Sewer Line Works Quantity 1.00 l.s. Materials PVC Pipe, 100mm Ø x 3m, S-100 9.00 pcs PVC Pipe, 50mm Ø x 3m, S-100 9.00 pcs 100mm Ø PVC Pipe Coupling 7.00 pcs 50mm Ø PVC Pipe Coupling 6.00 pcs PVC Elbow 90 deg. 100mm Ø 2.00 pcs PVC Elbow 45 deg. 100mm Ø 12.00 pcs PVC Wye 100mm Ø 7.00 pcs PVC Wye 100m x 50mm Ø 8.00 pcs PVC Elbow 90 deg. 50mm Ø 7.00 pcs PVC Elbow 45 deg. 50mm Ø 20.00 pcs PVC P-Trap with PO Plug 4.00 pcs PVC Sanitary Clean Out 100mm Ø 2.00 pcs PVC Solvent Cement 4.00 cans PPR Coupling 3/4 5.00 pcs PPR Coupling 1 5.00 pcs PPR Tee, 1 3.00 pcs PPR Tee, 3/4 15.00 pcs PPR Elbow 3/4 Plain 31.00 pcs PPR Reducer 1 x 3/4 5.00 pcs PPR Pipe 3/4 12.00 pcs PPR Pipe 1 5.00 pcs Gate Valve 2.00 pcs Teflon Tape 10m 5.00 pcs Consumables 5% of Materials 1.00 lot Labor 1 Foreman 3.00 days 2 Skilled Laborer 3.00 days 2 Laborer 3.00 days Equipment 1 Minor Tools 10% of Labor Cost 1.00 lot SPL-6 Electrical Works Quantity: 1.00 l.s Materials: 3.5mm2 THHN/THWN Wire 50.00 mtrs 2.0mm2 THHN/THWN Wire 1.00 box T8 18w Louver Type Double Tube Fluorescent 2.00 pcs 14w LED Bulb Daylight with receptacle 14.00 pcs 2 Gang Switch 2.00 pcs 1 Gang Switch 5.00 pcs 2 Gang Universal Type Outlet 5.00 pcs Junction Box 3.00 pcs Flexible Hose 1.00 roll Plastic Molding 1/2 8.00 pcs uPVC Pipe 1/2 18.00 pcs AMCO Box 10.00 pcs Panel board 6 branches 1.00 unit 60Amp Breaker 1.00 pc 20 Amp breaker 2.00 pcs 15 Amp Breaker 1.00 pcs Consumables 5% of Material Cost 1.00 lot Labor: 1 Construction Foreman 3.00 day 2 Skilled Worker 3.00 day 1 Laborer 3.00 day Pre-bid Conference: Approved Budget: 1,299,616.62 Closing Date: 29/05/2026
Company Industry: Municipal Corporations

Key values

Tender Estimated cost : PHP 1,299,617
Closing date : 29/05/2026
Location : Philippines - Not Classified

Tender Documents

Top