Filter
Filter
Tender Description Value Due Date
1. Sector:Safety Equipment\Explosives SCR Construction Organization - Engineering, Procurement and Construction (EPC) - Contract for "Construction of New Bi-Directional Twin Tunnels on diversion (1) Main Tunnel of 6.70 Km long each (6.05 Km Main Tunnel length + 0.65 Km Main Cut & Cover length and 1.8 Km approach length for Main Tunnel) (2) Evacuation Tunnel of 6.70 Km long each (6.05 Km Evacuation Tunnel length + 0.65 Km Evacuation Cut & Cover length and 1.8 Km... INR 1124.48 Cr INR 11.24 Bn
11 Days to go
29-Sep-2025
TOI : 84534896 India | Maharashtra
2. Sector:Railways Transport Services Construction of Viaduct no 193 (10X 24.40M Composite Girder) at Bhabadighi in between Goghat - Kamarpukur in connection with Tarakeshwar - Bishnupur New BG Line project. INR 51.06 Cr INR 510.64 Mn
28 Days to go
16-Oct-2025
TOI : 87900242 India | Multi State
3. Sector:Water Storage and Supply Construction of Lhs in Lieu of Lc No. 299 & Rob in Lieu of Lc No.298 on Bilaspur- jharsuguda Section Under S.e.c. Railway. INR 32.11 Cr INR 321.15 Mn
733 Days ago
16-Sep-2023
TOI : 63764380 India | Chhattisgarh
4. Sector:Power Plant Safe closure of adits, tunnels, surge shaft from Gunga Gangnani to TRC site near Pala of Loharinag-Pala HEP 600 MW discontinued in district . Refer Document
474 Days ago
01-Jun-2024
TOI : 71082675 India | Uttaranchal
5. Sector:Non Classified Engineering works and construction works –Aramis Project - (Micro)tunnel works Refer Document
28 Days to go
16-Oct-2025
TOI : 86229776 Netherland | Not Classified
6. Sector:Railway Ancillaries Expression of Interest from Companies having Experience in Pre-bid Consultancy for Metro Rail, Railways, Highways, Bridges, Tunnels, Marine Ports, Airports, Buildings, Workshops/Depots., Irrigation and Water resources, DPR works etc. Refer Document
4 Days to go
22-Sep-2025
TOI : 87206721 India | Multi State
7. Sector:Railways Transport Services Engineering, Design and Construction of Viaduct Length 46.23 kms (3 corridors) (including 20.16 Kms of Double Decker 4 Lane Flyover cum Metro Viaduct) and 42 Nos. Elevated Metro stations, etc., all as specified on EPC basis for Phase-1 of Visakhapatnam Metro Rail, at Visakhapatnam, Andhra Pradesh, India. INR 6250 Cr INR 62.50 Bn
19 Days to go
07-Oct-2025
TOI : 87356242 India | Andhra Pradesh
8. Sector:Railways Transport Services Engineering, Design and Construction of Viaduct Length 38.40 kms (including 4.33 Kms of Double Decker 4 Lane Flyover cum Metro Viaduct) 01Nos. Underground metro station and 32 Nos Elevated Metro stations, etc. all as specified on EPC basis for Phase-1 of Vijayawada Metro Rail, at Vijayawada Andhra Pradesh, India. INR 4150 Cr INR 41.50 Bn
26 Days to go
14-Oct-2025
TOI : 87453452 India | Andhra Pradesh
9. Sector:Railways Transport Services Construction of New Tunnel-28 containing Two line crossing Tupul station in between Tunnel-26B and Tunnel-1and Design of Broad Gauge Ballastless Track including proof checking, supply, installation, testing and commissioning all necessary structures for operation purposes, in Noney-Imphal section.
Design, supply, erection & commissioning of tunnel ventilation, Electrical and mechanical system Electrification and...
INR 1199.72 Cr INR 11.99 Bn
26 Days to go
14-Oct-2025
TOI : 87446738 India | Manipur
10. Sector:Railways Transport Services (1) Construction of New Tunnel-28 containing Two line crossing Tupul station in between Tunnel-26B and Tunnel-1and Design of Broad Gauge Ballastless Track including proof checking, supply, installation, testing and commissioning all necessary structures for operation purposes, in Noney-Imphal section (2) Design, supply, erection & commissioning of tunnel ventilation, Electrical and mechanical system Electrification and... 1199.72 Cr 11.99 Bn
26 Days to go
14-Oct-2025
TOI : 87194927 India | Manipur
  • Show
  • Tenders
Top