Filter
Filter
Tender Description Value Due Date
1. Sector:Roads Development, Operation and Maintenance of Ropeway Between Kathgodam to Hanumangarhi in District Nainital in the State of Uttarakhand on Hybrid Annuity Mode 1592.87 Cr 15.92 Bn
Closing today
15-Jan-2025
TOI : 70488876 India | Uttaranchal
2. Sector:Power Plant Electro Mechanical Works of 3x100 MW Lakhwar MPP
Electro Mechanical Works of 3x100 MW Lakhwar MPP on EPC basis.
595.80 Cr 5.95 Bn
17 Days to go
01-Feb-2025
TOI : 74927536 India | Uttaranchal
3. Sector:Power Plant Construction of barrage intake and its appurtenant works including river diversion of Tiuni Plasu hep 72MW on river tons in Dist Dehradun of Uttarakhand 134.06 Cr 1.34 Bn
10 Days to go
25-Jan-2025
TOI : 75205272 India | Uttaranchal
4. Sector:Power Plant Construction of head race tunnel adits surge shaft excavation of penstock of tiuni plasu HEP 72 MW on river tons in district Dehradun of Uttarakhand 131.76 Cr 1.31 Bn
10 Days to go
25-Jan-2025
TOI : 75205276 India | Uttaranchal
5. Sector:Non Classified Transformative Restoration and Enrichment works of Chaurasi Kutiya Swargashram, Gauhari Range Rishikesh ( Uttarakhand).. 97.98 Cr 979.85 Mn
15 Days to go
30-Jan-2025
TOI : 78850772 India | Uttaranchal
6. Sector:Power Plant Construction of power house building tail race channel switch yard and other associated work of power house site of Tiuni Plasu HEP 72 MW on river Tons in district Dehradun of Uttarakhand 49.77 Cr 497.70 Mn
10 Days to go
25-Jan-2025
TOI : 75205278 India | Uttaranchal
7. Sector:Civil Works Construction of Sub District Hospital at Purola, Uttarkashi, Uttarakhand. 32.10 Cr 321.00 Mn
15 Days to go
30-Jan-2025
TOI : 79711064 India | Uttaranchal
8. Sector:Security Services Constructions of various infrastructures at new BOP Wilsya base of 7th Bn ITBP Mirthi (UKD) INR 14.71 Cr INR 147.15 Mn
12 Days to go
27-Jan-2025
TOI : 79837258 India | Uttaranchal
9. Sector:Security Services Construction of Infrastructure and Other Development Work at 15016 Feet Above Msl Upto 6 Feet Snow Accumulation in Winter and the Site Distance is 189 Km 168 Km Metaled and 21km Kucha Road From Uttarkashi in Harshil Valley of 35th Bn Itb Police INR 14.24 Cr INR 142.41 Mn
14 Days to go
29-Jan-2025
TOI : 79728958 India | Uttaranchal
10. Sector:Security Services Construction of Infrastucture and other development work at 15016 feet above MSL, up to 6 feet snow accumulation in winter and the site distance is 189 km from Uttarkashi in Harshil Valley of 35th Bn ITBP, Mahidanda (UKD) INR 14.24 Cr INR 142.41 Mn
14 Days to go
29-Jan-2025
TOI : 79837237 India | Uttaranchal
  • Show
  • Tenders
Top